• it
  • en
  • DSCN0391   La Preferita Dal Cliente
  • SAPONI SYNDETS & NATURALI

    SAPONI SYNDETS & NATURALI

    Profumati, colorati, cremosi adatti alle pelli delicate
  • SAPONI SYNDETS

    SAPONI SYNDETS

    Con basi Syndets utilizzano solo materie prime di qualità e di origine vegetale
  • Saponi tradizionali

    SAPONI Tradizionali

    Ottenuti con metodi tradizionali come la saponificazione, sapone di Marsiglia, vegetale e traslucido
  • Sicurezza

    SICUREZZA

    I saponi subiscono severi controlli di qualità in ogni passaggio produttivo

Planning Modalities

Initial product design

The planning activities start with the request for new products from clients, and they are usually preceded by an initial basic phase of design. During this stage, the R&D Lab defines the possibility to develop new products, inspirited by the market trends or from client’s ideas, or reformulating existing products, always keeping in mind normative regulations and the final consumer.

Project planning

The Product Profile is used as input for the project planning.
The project is designed on a “Project Plan”, where are indicated the different development stages, and their timing.

 

Planning


  1. Client request / Basic design
  2. Project opening
  3. Drafting the Project Plan
  4. Maximized test on the product
  5. Bibliography research
  6. Formulation development

              – Sample production
              – Definition of tests on sample
              – Test on product sample and their compliance with:
              • Technical parameters
              • Utility parameters
              • Stability

  1. Formula cost settlement
  2. Industrial test realization
  3. Product cost settlement
  4. Collect and/or select the technical sheets to clients
  5. Packaging design

 


Planning Results (OUTPUTS)

The planning results are expressed through a series of documents
Normally all or part of these documents may constitute the results of planning:

The Product Specific which describes the overall and physical/chemical characteristics of the product.

• Quali-quantitative formula
• Production method & packaging method
• Final product’s bill of material
• In-admitting control plan for materials and raw materials
• Semi-manufactured control plan
• Final product controls plan
• Packaging materials design and specifications (possibly transmitted by suppliers)
• Packaging materials design and specifications (possibly transmitted by suppliers)
• Raw materials technical data sheet and safety data sheet

 


 

Planning Validation

The project is subjected to validation, with the scope of providing the real product correspondence with the manufacturing and usability requirements. 

CERTIFIED COMPANY ACCORDING TO QUALITY SYSTEM AND GOOD MANUFACTURING PRACTICES (GMP).
  • Uni En Iso
  • Dl126

Questo sito utilizza cookie al fine di consentire la normale navigazione e fruizione del sito stesso e per tracciare informazioni statistiche in forma anonima e aggregata. La prosecuzione della normale navigazione comporta la prestazione del consenso all'uso dei cookie. E' possibile negare il consenso a qualunque cookie seguendo il link Cookie Policy

Questo sito utilizza i cookie per fornire la migliore esperienza di navigazione possibile. Continuando a utilizzare questo sito senza modificare le impostazioni dei cookie o cliccando su "Accetta" permetti il loro utilizzo.

Chiudi